Hi,

 

One situation:

On upstream project- tie with group of slaves.

Downstream project- also tie with group of slaves.

 

But downstream project should tie with one slave dynamically based on slaves at which upstream project is tied.

 

Is there any solution for such situation.

 

Regards,

Hiteswar

Sami Tikka

Re: how downstream job tie with slave dynamically

Reply Threaded More More options
Print post
Permalink
What is the reason for slave building a downstream project to be the
same as slave that built the upstream project?

I do not think there is a way to force those slaves to be the same in
Hudson but maybe we can find another way to solve that if we knew what
you are trying to accomplish.

-- Sami

2009/11/4 Kumar, Hiteswar X <[hidden email]>:

> Hi,
>
>
>
> One situation:
>
> On upstream project- tie with group of slaves.
>
> Downstream project- also tie with group of slaves.
>
>
>
> But downstream project should tie with one slave dynamically based on slaves
> at which upstream project is tied.
>
>
>
> Is there any solution for such situation.
>
>
>
> Regards,
>
> Hiteswar

---------------------------------------------------------------------